logo

Nachricht an ITC schickenBookmark setzenSchrift verkleinernSchrift vergrößernDruckversion

Reporting

Reporting provides a large number of standardized logging formats for strata, tunneling logs or shift reports. Thus, the data can be summarized and presented within a short time on a daily, weekly or monthly basis. Automatic log generation relieves the daily work on the construction site and ensures a consistent report format for the entire project duration. These documents are exported by default as a PDF document; other export formats for graphs (e.g. JPG) are also possible.

Feature Tour

 

Downtime evaluation

data can be analysed for any time period or tunnel section.>

Weekly or monthly reports

TBM performance at-a-glance. 

Daily report

with detailed shift information.

Cutter tool management:

report about tool exchanges.